Case Study 1 - Costa Coffee, Derby
Longsands Engineering Ltd were consulted in February 2018 to provide a full package of connection designs for the new Costa Coffee pod in Derby City Centre.
​
Connections included moment connections and base plate designs to Client specific loading executed to Eurocode suite of standards.
​
Designed, drawn, fabricated and erected within 2 months this project was time critical and Longsands Engineering were able to react to support the short lead time.

Case Study 2 - Middle Drive, Darras Hall
In April 2018 Longsands Engineering were consulted to design a bespoke property in Darras Hall. The design included a bespoke curved glass balcony.
​
Using Autodesk Fusion 360 we were able to model the steelwork and get a life like representation of the steelwork prior to installation. The steelwork will be erected in early 2019.